How much fallow process the Estimation of building


Estimation is process of before start of work any site construction in which we find out whole of cost make a building and also duration, resources etc required for building construction and also that is called estimation.



There are some process required a complete estimation of building

  • Site cleaning
  • Layout
  • Excavation
  • Sand filling
  • Plain cement concrete (PCC)
  • Footing concrete
  • Footing shuttering
  • Pedestal column
  • Pedestal column shuttering
  • Back filling
  • One line brick work for ground beam
  • Ground beam & ground beam shuttering
  • Brick work up to bottom
  • DPC & Bitumen coat
  • Plinth filling
  • Floor pcc
  • One line brick work for super structure
  • DPC for super structure
  • Brick work up to sill band bottom
  • Sill band
  • Brick work up to lintel level
  • Lintel beam
  • Brick work up to slab beam bottom
  • Slab beam & slab
  • Plastering work
  • Painting work
  • Flooring 
  • Door
  • Window
  • Staircase
  • Plumbing

SITE CLEANING

The process of construction cleaning is much more complicated than a typical cleaning job due to the nature of the materials being removed from the work site. there will grass, trees, vegetation, disposal & unservicable materials are i the site, so these items are to be cleaned before construction process is to be done.
In site cleaning measurements are done in area (sqr) up to two decimal places, & take 1 m extra in all direction.